Waste Storage Facility Construction

We Kando | GreenTec | Suffcon Alliance

Client: APA Transmission Pty Ltd
Location: Morven, Qld

Value: $4.22M

Duration: February 2024 – July 2024

Key quantities and technical works included:

28,800m³

of embankment fill for pond formation

12,100m³

of non-permeable material placed to form the clay liner base

45,200m²

of geomembrane lining prepared and installed to contain waste materials

x2 450mm

internal culverts installed for effective site drainage

12,600m³

of topsoil spread for site rehabilitation and erosion control

1.6 km

of 1.8 m high security fencing, scheduled for installation at a later date

Project Overview

In 2022, under an alliance delivery model, We Kando, GreenTec, and Suffcon collaboratively delivered a five-cell waste storage facility to support the growing needs of the coal seam gas (CSG) sector and local industry in the management and disposal of waste fluids.

The facility was designed to provide safe, compliant, and scalable storage capacity while incorporating key access and environmental sustainability features. Located adjacent to the Carnarvon Highway, the project involved significant earthworks and infrastructure construction to ensure long-term functionality and operational efficiency.

The alliance approach enabled streamlined decision-making, efficient resource allocation, and enhanced collaboration between stakeholders — delivering a robust and future-ready waste management facility. The project has become a key asset in supporting environmental compliance and operational demands of the region’s energy and industrial sectors.

Scope of Works
  • Five engineered waste storage ponds, lined with HDPE liners to regulatory standards

  • 1.8 km of internal access roads to connect and service each cell

  • Bitumen-sealed road access connecting the site to the adjacent Carnarvon Highway

  • 4 concrete unloading bays with washdown facilities at each

Services
  • Project Management

  • Bulk earthworks

  • Pavement material production/crushing

  • Bulk haulage

  • Road pavement construction