Bollon Road Construction
Client: Maranoa Regional Council
Location: Bollon, Qld
Value: $7.02M
Duration: February 2024 - September 2024
The scope of works included:
100,000m²
of vegetation clearing and
grubbing
58,000m³
of bulk earthworks
30,000t
Production and placement
of pavement material
7
Supply and installation of 7
stormwater drainage structures
Project Overview
In late 2023, Suffcon was engaged by Council to deliver Stage 1 of the Mitchell–Bollon Road construction project. Located approximately 70 kilometres south of Mitchell, Queensland, the project involved the upgrade of a 6.5 kilometre stretch of road network, incorporating a combination of greenfield and brownfield works.
Leveraging our experienced team, Suffcon collaborated closely with Council’s Project Team to optimise both the road design and material supply strategies — ensuring cost efficiency and design effectiveness.
This project demonstrates Suffcon’s ability to deliver innovative and environmentally responsible infrastructure solutions, integrating technical excellence with practical outcomes for sustainable regional industries